This keyword controls production costs for every node type with factors. This keyword is given for every occurring node type in the calculation. Up to 14 values can be given for time and factor. This keyword is ended with /. Time is specified with decimals used to indicate part-hours. In the calculation, given factors are interpolated between given times.
FORMAT:
*OFAC Typ:Nodetyp
Tidpunkt1 Faktor
Tidpunkt2 Faktor
...
Tidpunkti Faktor
/
Where:
Nodetyp Node type 1 to 10
Tidpunkt Time (decimal).
Faktor Decimal value by which the specified production cost is to be
multiplied.
Example:
*OFAC Typ: 1
0.00 0.80
5.00 0.80
5.50 1.00
19.00 1.00
23.00 0.80
/