Create production plant

Select the node in the network which will include the production plant.

Open the table Production plant, right-click in the empty column at the far left, then select Create new.

The detail form for production plants now opens.

·      Give your plant a name (max. 8 characters).

·      Enter the supply pipe temperature.

·      Leave the fields current flow and current power empty.

·      Place the plant in a node by selecting a node in the list, or select the “globe” if you have selected the node in the map.

·      Select Pressurisation return and then enter the static pressure.

The production plant has been defined. Select Save to save it, then close the form.