Select the node in the network which will include the production plant.
Open the table Production plant, right-click in the empty column at the far left, then select Create new.
The detail form for production plants now opens.
· Give your plant a name (max. 8 characters).
· Enter the supply pipe temperature.
· Leave the fields current flow and current power empty.
· Place the plant in a node by selecting a node in the list, or select the “globe” if you have selected the node in the map.
· Select Pressurisation return and then enter the static pressure.
The production plant has been defined. Select Save to save it, then close the form.